Draft Environmental Impact Statement (DEIS)

Please click on the buttons below to view the DEIS and Joint Federal/State Permit Application (JPA), find document availability locations to review hard copies of the DEIS and JPA, view dates and how to participate in the joint public hearings, and ways to comment on the DEIS and JPA.

To view mapping of the Build Alternatives analyzed in the DEIS and the environmental resources along the study corridors, review the interactive map here.

Introduction

FHWA and MDOT SHA have completed the Draft Environmental Impact Statement (DEIS) and Draft Section 4(f) Evaluation for the Managed Lanes Study, with the Notice of Availability published in the Federal Register on July 10, 2020. The DEIS includes traffic, environmental, engineering, and financial analyses of the Build Alternatives and the No Build Alternative. This DEIS provides an opportunity for the public, interest groups and other agencies to review and provide comment on the proposed federal action and the adverse and beneficial environmental impacts and proposed mitigation for unavoidable impacts.

FHWA, MDOT SHA, and the Maryland Department of the Environment (MDE) will conduct six Joint Public Hearings. The U.S. Army Corps of Engineers (USACE) will participate in one hearing on August 25 to meet the Department of the Army requirements. Comments will also be accepted on the Joint Federal/State Application (JPA) for the Alteration of Any Floodplain, Waterway, Tidal or Nontidal Wetland in Maryland. USACE is responsible for reviewing the JPA per the Clean Water Act, Section 404(b)(1) and MDE is responsible for reviewing the Application per Environment Article §5-503 and §5-906, Annotated Code of Maryland.

Public and agency comments on the DEIS will be accepted between July 10 and October 8, 2020. COMMENT PERIOD EXTENDED TO NOVEMBER 9, 2020

View the informational flyer here. Also available in Amharic, French, and Spanish.


View the DEIS Documents

FHWA and MDOT SHA have completed the Draft Environmental Impact Statement (DEIS) and Draft Section 4(f) Evaluation for the Managed Lanes Study, with the Notice of Availability published in the Federal Register on July 10, 2020. The Draft Environmental Impact Statement or DEIS provides a summary of the 19 technical reports and contains ten chapters.

Executive Summary also available in AmharicFrench, and Spanish.

DEIS Document by Chapter

Title Page, Signature Page & Table of Contents

Executive Summary of the DEIS

Chapter 1 presents the Study’s Purpose and Need

Chapter 2 presents the alternatives development and analysis

Chapter 3 presents the existing and future traffic conditions and the results from the traffic operational analyses

Chapter 4 presents the existing environmental conditions (affected environment), the anticipated effects to the resources (environmental consequences), and measures to avoid, minimize, and mitigate potential environmental effects, where applicable.

Chapter 5 presents a summary of the Draft Section 4(f) Evaluation, which discusses the potential effects to significant public parks, recreational areas, and historic properties in compliance with Section 4(f) of the US Department of Transportation (USDOT) Act of 1966.

Chapter 6 presents the Executive Order 13807: Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure Projects that requires Federal agencies to process environmental reviews and authorization decisions for major infrastructure projects as “One Federal Decision.”

Chapter 7 presents a summary of the public outreach and agency coordination for the Study that has occurred, to date.

Chapter 8 presents the List of Preparers of the DEIS

Chapter 9 presents the Distribution List of agencies, organizations, and persons to whom the DEIS was made available for review and comment.

Chapter 10 presents the references for the DEIS.

DEIS Technical Reports

To review the 19 supporting DEIS Technical Reports click on the report titles below.  Note, unless otherwise listed the appendices supporting each DEIS Technical Report are include in the single file for viewing, if applicable. In cases where the files are large, they have been broken up into smaller file sizes for viewing.

APPENDIX A Purpose and Need Statement
APPENDIX B

Alternatives Technical Report

Appendix A & B: MD 200 Diversion Alternatives Analysis Results Paper and Alternative 9 Modified Preliminary Evaluation

APPENDIX C Traffic Technical Report
APPENDIX D Environmental Resource Mapping
APPENDIX E Community Effects Assessment/ Environmental Justice Technical Report
APPENDIX F Draft Section 4(f) Evaluation
APPENDIX G

Cultural Resources Technical Report (Redacted)

Volume 1:    Overview and Effects Assessment

Volume 2:    Archaeological and Historic Architectural Gap Analysis and Assessment

Volume 3 Part 1:    Architectural Resources Evaluation Technical Report 

Volume 3 Part 2

Volume 3 Part 3

Volume 4:    Phase I Archaeological Investigation

Volume 5:    Phase II Archaeological Evaluation at Sites 18PR750, 18MO749, and 18MO751 for the I-495 & I-270 Managed Lanes

Volume 6:    Phase I Archaeological Survey, Intensive Phase I Archaeological Survey of 44FX0373, and Phase II Archaeological Evaluation at Sites 44FX0374, 44FX0379, 44FX0381, 44FX0389, 44FX3160, and 44FX3900 Within the George Washington Memorial Parkway for the I-495 Northern Extension (NEXT) Project and the I-495/I-270 Managed Lanes Study, Fairfax County, Virginia

APPENDIX H Draft Section 106 Programmatic Agreement
APPENDIX I Air Quality Technical Report
APPENDIX J Noise Analysis Technical Report
APPENDIX K

Hazardous Materials Technical Report

Appendix A: Priority Table

Appendix B: 700-foot Scale Sites of Concern Maps

Appendix C: 200-foot Scale Potential Environmental Concerns Maps

Appendix D: EDR Report

Appendix E: MDE Records

Appendix F: Photo Log

APPENDIX L

Natural Resources Technical Report

Appendix A: Impact Tables

Appendix B: Natural Resources Inventory Maps

Appendix C: Soil Tables

Appendix D: Overview and Key Maps

Appendix E: Delineated Features Table

Appendix F: Delineated Features Maps

Appendix G Part 1: Field Datasheets 

Appendix G Part 2

Appendix H Part 1: Photo Documentation 

Appendix H Part 2

Appendix H Part 3

Appendix I: NPS Property Additional Information

Appendix J: Wetland Functions and Values Table

Appendix K: Aquatic Biota and Surface Water Sampling Monitoring Map

Appendix L: Wildlife Table

Appendix M: Aquatic Biota Monitoring Table

Appendix N: Agency Correspondence

Appendix O: Sampled Fish Table

Appendix P: Bridge Survey Report Northern Long Eared Bat and Indiana Bat

Appendix Q: Unique and Sensitive Areas Map

Appendix R: RTE Plant Species Survey

APPENDIX M Avoidance, Minimization & Impacts Report (AMR)
APPENDIX N Draft Compensatory Mitigation Plan
APPENDIX O Indirect and Cumulative Effects Technical Report
APPENDIX P Public Involvement & Agency Coordination Technical Report
APPENDIX Q Conceptual Mitigation Plan
APPENDIX R Joint Permit Application
APPENDIX S Environmental Assessment Form

DEIS and JPA In-Person Document Availability

Hard copies are available for review of the DEIS and JPA.  The DEIS Technical Reports and JPA Appendices are also available electronically with the hard copies of the DEIS and JPA.  Hard copies are available for review as follows or view the document locations map:

MARYLAND STATE OFFICES: Viewing hours include Monday to Friday 11 AM to 7 PM, Saturday and Sunday 12 to 5 PM

Montgomery County: MDOT SHA Gaithersburg Shop, 502 Quince Orchard Road, Gaithersburg, MD 20878 | MDTA MD 200 West Operations, 16902 Crabbs Branch Way, Rockville, MD 20855 | MDOT SHA Fairland Shop, 12020 Plum Orchard Road, Silver Spring, MD 20904 | MDOT SHA Silver Spring Study Office, 8537 Georgia Avenue, Silver Spring, MD 2091 

Prince George’s County: MDOT SHA District 3 Office, 9300 Kenilworth Avenue, Greenbelt, MD 20770

VIRGINIA STATE OFFICE: Viewing hours include Monday to Friday 9 AM to 4 PM

Fairfax County: VDOT Northern Virginia District Office, 4975 Alliance Drive, Fairfax, VA 22030

MARYLAND LIBRARIES: Hard copies will be available in trailers in the library parking lots. Viewing hours include Tuesday and Thursday 11 AM to 7 PM, and Sunday 12 to 5 PM. Once libraries are open to the public, the hard copies will be available for review in the libraries during normal branch hours.

Montgomery County: Chevy Chase Library | Davis (North Bethesda) Library | Kensington Park Library | Potomac Library

Prince George’s County: Glenarden Branch Library | Largo-Kettering Branch Library | New Carrollton Branch Library | Spauldings Branch Library

WASHINGTON DC LIBRARY: Viewing hours include Monday through Friday from 11 AM to 2 PM and 3 to 7 PM. Should library hours change, the document will be available during normal branch hours.

Washington DC: Shepherd Park Neighborhood Library

US POST OFFICES: Viewing hours include Monday to Friday 9 AM to 5 PM, Saturday 9 AM to Varies (see below)

Montgomery County: West Lake PO (Saturday closes at 1 PM), 10421 Motor City Drive, Bethesda, MD 20817 | Rockville PO (Saturday closes at 4 PM), 500 N Washington Street, Rockville, MD 20850

Prince George’s County: Kenilworth PO (Saturday closes at 12 PM ), 6270 Kenilworth Ave, Riverdale, MD 20737 | Hampton Park PO (Saturday closes at 4 PM), 9201 Edgeworth Drive, Capitol Heights, MD 20790 | Largo PO (Saturday closes at 3 PM), 9801 Apollo Drive, Upper Marlboro, MD 20774 | Temple Hills PO, 4806 Saint Barnabas Rd, Temple Hills, MD 20748